MP Design Group was hired by Necaise Brothers Construction toperform all required construction staking to complete the infrastructure construction of the West Pier Phase 1 & 2 & North Harbor West Pier. This also included building the 3D models used for machine control grading.

Gulfport-8-1024x659.jpg

PORT OF GULFPORT
West Pier Infrastructure Phase 1 & 2, North Harbor West & Small Craft Harbor Pier

PROJECT SIZE

VARIES

CONSTRUCTION COST

$90,000,000

YEAR OF COMPLETION 

ON GOING

LOCATION

Gulfport, MS

CLIENT

HUD Project - Port of Gulfport

SUMMARY

MP Design Group was hired by Necaise Brothers Construction to
perform all required construction staking to complete the infrastructure construction of the West Pier Phase 1 & 2 & North Harbor West Pier. This also included building the 3D models used for machine control grading.


Project #302 & #304 West Pier Infrastructure Phase 1 & 2
CONSTRUCTION COST $45M


MP Design Group was hired by Necaise Brothers Construction to
perform all required construction staking to complete infrastructure
construction and as builds for the West Pier Phase 1 & 2 and North Harbor Improvements.

 

Project # 307 North Harbor West
CONSTRUCTION COST $13M

 

Project # 410 Small Craft Harbor Piers
CONSTRUCTION COST $1.3M

 

MP Design Group was hired by Michael Baker Inc. To perform all
electrical engineering as well as Topographic Survey for the new Pier.