MARKET SECTOR: INDUSTRIAL
PORT OF
GULFPORt
Gulfport, MS
MP Design Group was hired by Necaise Brothers Construction toperform all required construction staking to complete the infrastructure construction of the West Pier Phase 1 & 2 & North Harbor West Pier. This also included building the 3D models used for machine control grading.
PORT OF GULFPORT
West Pier Infrastructure Phase 1 & 2, North Harbor West & Small Craft Harbor Pier
PROJECT SIZE
VARIES
CONSTRUCTION COST
$90,000,000
YEAR OF COMPLETION
ON GOING
LOCATION
Gulfport, MS
CLIENT
HUD Project - Port of Gulfport
SUMMARY
MP Design Group was hired by Necaise Brothers Construction to
perform all required construction staking to complete the infrastructure construction of the West Pier Phase 1 & 2 & North Harbor West Pier. This also included building the 3D models used for machine control grading.
Project #302 & #304 West Pier Infrastructure Phase 1 & 2
CONSTRUCTION COST $45M
MP Design Group was hired by Necaise Brothers Construction to
perform all required construction staking to complete infrastructure
construction and as builds for the West Pier Phase 1 & 2 and North Harbor Improvements.
Project # 307 North Harbor West
CONSTRUCTION COST $13M
Project # 410 Small Craft Harbor Piers
CONSTRUCTION COST $1.3M
MP Design Group was hired by Michael Baker Inc. To perform all
electrical engineering as well as Topographic Survey for the new Pier.